News Design and Build Construction of Infrastructure (96 hectares) and Waste Water Treatment Plant of Sanliurfa OIZ 2 (Organized Industrial Zone), Sanliurfa, Turkey

Reference: EuropeAid/125259/D/WKS/TR
Status: Open (until 06.06.2008)

1.         Publication reference: EuropeAid/125259/D/WKS/TR
2.         Procedure: Open
3.         Programme: 2006 National Pre-Accession Financial Assistance Programme for Turkey
4.         Financing: EC Contribution Budget Item 22.020401 of the General Budget of the EC (68%) and National Contribution (32%)
5.         Contracting Authority: CFCU

The tenderer may tender only for the works of either Lot 1 or Lot 2 or he may tender for the entire works of both Lot 1 and Lot 2 as a whole.

Lot 1: Design-build construction of the infrastructure of the first 96 hectares of  Sanliurfa OIZ 2

Design-build construction of the infrastructure (roads, rain water, potable and utility water, sewage system, HV-LV electricity, energy transmission line, communication, natural gas and etc.) works of the first 96 hectares of Şanlıurfa OIZ 2 listed as and preparation of application designs for 1170 ha.

o        Constructing: - Earthmoving for roads structures
o        Utility water system
o        Rainwater drainage system and manholes
o        Wastewater drainage system and manholes
o        Electric power lines transformer stations
o        Natural gas system
o        Construction of sub-base, base and pavement of roads and sidewalks
o        Lightening of roads
o        Telecommunication

Lot 2: Design-build construction of the Waste Water Construction Plant for OIZ 1 and OIZ 2

Design-build construction of the waste water treatment plant that will be located in Şanlıurfa OIZ 2 and will serve to OIZ 1 and OIZ 2. The construction works will include civil works, mechanical works, electrical works, automation works, trial operation (commissioning and the operation) of the Waste Water Treatment Plant, listed as:

-          Constructing works
-          Mechanical works
-          Electrical works
-          Automation works
-          Trial Operation (3 months)

7.         Number and titles of lots

2 Lots

Lot 1:              Design-build construction of the infrastructure of the first 96 hectares of  Sanliurfa OIZ 2 : Design and construction of infrastructure (roads, rain water, potable and utility water, sewage system, HV-LV electricity, energy transmission lines, communication lines, natural gas and etc.) of the first 96 ha of the Şanlıurfa OIZ II and preparation of application designs for 1170 ha.

Lot 2:              Design-build construction of the Waste Water Construction Plant for OIZ 1 and OIZ 2 : Design and construction of wastewater treatment plant that will serve to the factories in both OIZ I and OIZ II for 4000 m3/day and preparation of application designs according to total capacity.

Deadline for submission of tenders: Before Friday, 6 June 2008 at 10:00 a.m. local time.

Contact information CFCU (email: http://www.cfcu.gov.tr)
News type Inbrief
File link http://ec.europa.eu/europeaid/tender/data/d69/AOF82869.htm
Source of information EuropeAid
Subject(s) ANALYSIS AND TESTS , CHARACTERISTICAL PARAMETERS OF WATERS AND SLUDGES , DRINKING WATER AND SANITATION : COMMON PROCESSES OF PURIFICATION AND TREATMENT , SANITATION -STRICT PURIFICATION PROCESSES
Relation http://www.emwis.net/countries/fol749974/country378851
Geographical coverage Turkey
News date 06/03/2008
Working language(s) ENGLISH
PDF