Project Bursa Water and Sanitation Project

* Rehabilitation and extension of the existing water supply system;
* Extension of the sewerage collection networks;
* Reconstruction of the sewer connections;
* Wastewater plants;
* Rehabilitate of the existing storm water drainage networks;
* Extension of the storm water collection system in flood areas;
* Reduction of unaccounted-for water (UFW);
* Water tariff study and feasibility of leasing arrangements;
* Rehabilitation of the existing waste dump site;
* Development of a new landfill site;
* Construction of a waste transfer station;
* Provision of vehicles and containers to collect waste, including incineration of clinical waste;
* Establishment of a regulatory unit;
* Establishment of separate collection and treatment system of clinical and industrial waste;
* Contracting out of part of domestic waste collection;
* Technical assistance and training

Project number P009065
Subject(s) INFORMATION - COMPUTER SCIENCES , DRINKING WATER , no translation available , no translation available , no translation available , no translation available
Geographical coverage Turkey
Budget (in €) 258400000
Programme International program
Web site http://web.worldbank.org/external/projects/main?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P009065
Objectives

- The main objectives of the project are to improve environment conditions and reduce health hazards in Greater Bursa. The project has two distinct parts. The water supply, sewerage and storm water part includes:

(a) water supply works needed to renovate, rehabilitate, and extend the existing system;
(b) sewerage works needed to extend the collection networks, reconstruct sewer connections, and treat wastewater in two plants;
(c) storm water drainage works needed to rehabilitate the existing networks, and extend the collection system in flood areas; and
(d) technical assistance for project implementation (engineering services and project management) and for institutional development (reduction of unaccounted-for water, training, asset management system, management and information system, tariff study and feasibility of leasing arrangements).

-The solid waste part includes: (i) rehabilitation of the existing dump site, development of a new landfill site, construction of a waste transfer station; (ii) vehicles and containers to collect waste, including incineration of clinical waste; and (iii) technical assistance for project implementation (engineering services) and for institutional development (establishment of a regulatory unit, separate management of solid waste, separate collection and treatment of clinical and industrial waste, and contracting out of part of domestic waste collection

Period [03/11/1993 - 30/06/2001]

Partners

  • BUSKI (Bursa Water and Sewerage Administration)
    Bursa municipality
    Contact ,
    Position:
    Phone/fax: ,
    Email:

Funding sources

  • International Bank for Reconstruction and Development
    Source International Bank for Reconstruction and Development
    Programme International program
    Type
    Funding rate 50