Egyptian power station seeks desalination plant
A tender has been issued for water treatment and desalination
systems for Egypt's Ain Sokha Power Project with a deadline of
17 August 2009.
The joint clients are Egyptian Electricity Holding Company and East
Delta Electricity Production Company, and the consultant is Engineering
Consultants Group of Cairo.
The 2 x 650 MW gas/oil-fired power plant will incorporate a
direct (once through) cooling system using water abstracted from the
Gulf of Suez at 40-52 m³/s. Of this, 0.07% (up to 3,145 m³/d) will be
used, following pretreatment demineralization and desalination, to
provide process water make-up in the boiler system. Potable water
supplies will be drawn from the same existing supply system for the
Suez Gulf BOOT power plant.
The project will be financed by the World Bank.
Contact information | n/a |
---|---|
News type | Procurement |
File link |
http://www.desalination.biz/news/news_story.asp?id=4883 |
Source of information | Desalination.biz |
Keyword(s) | desalination plant |
Subject(s) | CHARACTERISTICAL PARAMETERS OF WATERS AND SLUDGES , DRINKING WATER AND SANITATION : COMMON PROCESSES OF PURIFICATION AND TREATMENT , ENERGY , FINANCE-ECONOMY , INDUSTRY , INFRASTRUCTURES , SANITATION -STRICT PURIFICATION PROCESSES , WATER QUALITY |
Geographical coverage | Egypt |
News date | 27/05/2009 |
Working language(s) | ENGLISH |