Mediterranean Water Information Mechanism
Portal under development for the feasibility study
 

PDF MedWIP: planning for the 2nd phase of feasibility study

Download 20070305-EM-PhaseII.2.pdf (226 KB)
View Open in browser
Upload date 09 Aug 2011
Contributor Eric MINO
Keywords environmental indicator, monitoring, pollution measurement
Release date 05/03/2007
All versions
# File name Upload date Size Content type
1 20070305-EM-PhaseII.2.pdf (current) 09 Aug 2011 226 KB application/pdf
Presented by Eric MINO